Another week in the Mount Hope construction zone...



Another productive week at our house!  Here are a few more pictures to document our remodel journey…

The refrigerator/freezer is finally installed and functioning!  This was a bit of a challenge…the fridge was delivered but the delivery guys weren’t equipped to set it up.  So thankfully two of our contractors were here and helped get it out of the boxes and set up, leaving the trim kit for John to attach. So that evening as John tackled this job we quickly realized a problem…when the store sent over the specs of the fridge, they didn’t include measurements for the trim kit.  This was a problem because the cabinet that was built to fit around the fridge/freezer wasn’t big enough to fit the trim kit.  So instead of being able to fill the new fridge, we had to figure out how to tackle this new glitch.  After some discussion, we all decided the best idea was to knock out the plaster behind the fridge to buy us an inch of space.  It’s amazing the difference 1” makes – who would have thought? So after making yet another mess in the kitchen, the fridge/freezer are in and filled – and they are awesome. I never thought we’d all be so excited about a refrigerator!  





The wood floors upstairs were stripped, stained and are finished!  Andy did a fantastic job and we are really happy with how they turned out.  Now on to the stairway…after it’s done we can get the kids’ rooms painted and set up.  They are ready!


Along with the floors, the kids’ bathroom is almost complete.  Concrete counters are in, toilet and sinks installed, and all but the grout is done on the tile.  The shower door will go in last after they refinish the tub next week.   It’s nice to know we’ll have another bathroom soon!





More lighting was installed this week as well. The front room entry light is beautiful (although I’m thinking it will look better after we make another trip to the hardware store for more light bulbs!) and the kitchen is much brighter with under the counter lighting and recessed lights over the fridge cabinet.  Lights are up in our bathroom and the kids’ bath.



Bell Glass & Mirror brought out all the bathroom mirrors, the master shower door and a BIG mirror for the workout center!  A very patient electrician spent some extra time moving light fixtures in the master so the mirrors would fit correctly J.  And even though John isn’t thrilled with the fact that the master shower door needed to be installed with a left-handed door, I personally think it’s great! 



Our friends the Forester's flew to Wichita this week to share in the construction chaos, and even joined in.  We finally decided we didn't need the cool (okay, freezing cold) breeze blowing in around the deck door, so Dave helped install some weather stripping.  It was so chilly it took a blow dryer to help solidify it in place!  I never knew he had such other talents than just being a great dentist!